Test cases
Each calculator has a first worked example on its page. The table lists those inputs and the expected outputs. Each output was recomputed from the printed formula, and rerun in the live tool in a browser, on 9 November 2026. If the tool, its page or this table disagree, that is a fault to report.
| Calculator | Inputs | Expected output |
|---|---|---|
| Simply supported beam reactions | Simply supported, 8 kN/m UDL, 6 m span | Reactions 24 kN each; midspan moment 36 kN·m |
| Beam deflection | 8 kN/m, 6 m, E 210 kN/mm², I 1.0×10⁻⁴ m⁴ | 6.43 mm |
| Rectangle section properties | b 100 mm, d 200 mm | I 66.67×10⁶ mm⁴; Z 6.67×10⁵ mm³ |
| Circle section properties | d 100 mm | A 7,854 mm²; I 4.91×10⁶ mm⁴; Z 98,175 mm³ |
| Direct stress | 100 kN on 2,000 mm² | 50 N/mm² |
| Young's modulus | 200 N/mm²; 2 mm extension on 2,000 mm | Strain 0.001; E 200 kN/mm² |
| Euler buckling load | E 210 kN/mm², I 1.0×10⁻⁵ m⁴, L 3 m, pinned | 2,303 kN |
| Resultant of two forces | 3 and 4, perpendicular | 5 at 53.13° |
| Concrete volume | 4.5 × 2.0 × 0.2 m, 5% allowance | 1.800 m³ net; 1.890 m³ to order |
| Earthworks volume | 30 × 8 m × 0.6 m, bulking 1.25 | 144 m³ in place; 180 m³ loose |
| Cantilever reactions | L 2.5 m, w 4 kN/m, P 5 kN | R 15 kN; M 25 kN·m |
| Trench excavation | 30 m × 0.6 m × 1.5 m, n 0, bulking 1.25, pipe 0.16 m | 27 m³ in place; 33.75 m³ loose; backfill 26.40 m³ |
| Cut and fill | L 20 m; cut 12 and 8 m²; fill 0 and 3 m² | Cut 200 m³; fill 30 m³ |
| Duct air velocity | 0.5 m³/s, 400 × 250 mm | 5.00 m/s; Dh 307.7 mm; 15 Pa |
| U-value from layers | Wall: 102.5/0.77, 100/0.022, 100/0.15, 12.5/0.21 | R 5.575 m²K/W; U 0.179 W/m²K |
| Pre-mixed concrete bags | 0.072 m³, yield 0.011 m³, 10%, 25 kg | 8 bags; 200 kg |
| Slab prop load screen | 250 mm, 26 kN/m³, 0.5 + 1.5 kN/m², 1.2 × 1.2 m | 8.5 kN/m²; 12.24 kN per prop |
| Average pad bearing pressure | 400 kN on 1.5 × 1.5 m | 178 kN/m² average |
| Formwork concrete pressure | 25 kN/m³ over 3 m | 75 kN/m² hydrostatic bound |
| Pipe velocity and head loss | 0.02 m³/s, 150 mm bore; f 0.02 over 50 m | 1.13 m/s; head loss 0.44 m |
| Pipe volume | 100 mm bore, 40 m | 0.314 m³ (314 litres) |
| Reynolds number | Water, 1.13 m/s, 150 mm, μ 0.001 Pa·s | Re ≈ 169,500, turbulent |
| Pressure from head | 10 m of water at 1,000 kg/m³ | 98.1 kPa |
| Pump hydraulic power | 0.02 m³/s, 15 m, water, 70% | 2.94 kW hydraulic; 4.20 kW shaft |
| Shaft power | 50 N·m at 1,450 rpm | 7.59 kW |
| Torque from force | 500 N at 0.25 m | 125 N·m |
| Gear ratio and output speed | 1,450 rpm, 20 teeth driving 60 | Ratio 3; 483 rpm |
| Ohm's law calculator | 230 V across 46 Ω | 5 A; 1,150 W |
| Series and parallel resistors | 10 Ω and 15 Ω, 12 V | 25 Ω series (0.48 A); 6 Ω parallel (2 A, 24 W) |
| Voltage divider | 12 V, R1 1 kΩ, R2 2 kΩ, unloaded | 8 V |
| Voltage-drop estimate | 16 A, 25 m, 2.5 mm² copper, 70°C, single-phase | 6.59 V (2.86% of 230 V) |
| Single-phase power | 230 V, 10 A, pf 0.9 | 2.07 kW; 2.30 kVA |
| Three-phase power | 400 V, 32 A, pf 0.85 | 18.84 kW; 22.17 kVA |
| Power-factor correction | 18.85 kW, pf 0.85 to 0.95 | About 5.49 kVAr |
| Slope and gradient | 0.15 m rise over 3 m | 5%; 2.86°; 1 in 20 |
| Stair rise and going | Private, 2,700 mm, rise 180 mm, going 250 mm | 15 risers; 35.8°; 2R+G 610 mm |
| Horizontal circular curve | R 200 m, Δ 40° | T 72.79 m; arc 139.63 m |
| Rational runoff | C 0.8, 50 mm/h, 0.4 ha | 44.5 L/s |
| Steel plate weight | 2 × 1 m × 10 mm at 7,850 kg/m³ | 157 kg |
| Rebar weight | 16 mm bar, 12 m | 1.578 kg/m; 18.94 kg |
| Mass from volume and density | 0.5 m³ at 2,400 kg/m³ | 1,200 kg |
| Thermal expansion | α 12×10⁻⁶ /K, 10 m, 40 K | 4.8 mm |
| Sensible heat | 50 kg water, c 4.186 kJ/kg·K, 20 K, 3 kW | 4,186 kJ (1.163 kWh); about 23.3 min |
| Fabric heat loss | U 0.28 W/m²K, 40 m², 20 K | 224 W |
| Percentage error | Measured 98, accepted 100 | 2% |
| Drawing scale converter | 25 mm at 1:50 | 1.25 m on site |
| Bulk file-name checker | Three example names, one duplicated, 2021 revision | 2 of 3 match, 1 duplicate |
| UK steel sections | 457 × 191 × 67 UB; lightest UB or UC with Iy ≥ 30,000 cm⁴ | 67.1 kg/m; 29,597 cm⁴. Finder: 533 × 165 × 66 UB, 65.7 kg/m |
| Lifting sling screen | 2 t, two legs, 1.6 t WLL, 30° to vertical | Factor 1.4; 2.24 t rated; 89% |
| Concrete maturity | Six-reading default log, −10 °C datum, 20 °C reference | 2,328 °C·h; equivalent age 77.6 h |
| Status code lookup | S4, both editions | Review and authorisation (2021); stage approval (2018) |
| Information standard generator | Default codes, 2021 revision | Example name PRJ-ABC-XX-XX-D-A-0001 |
| Engineering unit converter | 150 psi to bar | 10.34 bar |
| File-name checker | PRJ-ABC-ZZ-01-DR-S-0001 against the seven-field pattern | Pass: seven fields match |
Results are rounded as shown on each page. The guides chain several of these cases together, for example the pumped main in fluid logic.
What we will not add
Code unity checks, reinforcement design, cable selection from BS 7671 tables, or a “pass” badge. Those need a project standard and a responsible person. A green tick on a free page would be the wrong product.
If a worked case disagrees with its formula, report it through the contact page. About the site describes how pages are written and checked.
Last checked 14 October 2026.