Home · Guides
Guides
Short references on information management and preliminary calculations. They describe practice. They do not reproduce BSI or ISO text.
Latest news: Part K review: BSR calls for evidence on stairs, guarding and impact (30 October 2026). All news
Start here by role
BIM or information coordinator: ISO 19650 in plain English, then CDE states and file naming. Site or project engineer: temporary works, setting-out logic and bearing screens. Student: the chained examples in structural and fluid logic, with the glossary open.
New to information management? Read ISO 19650 in plain English, then what a CDE is and the four CDE states. Before the first upload, agree file naming and test a name with the file-name checker. For the numbers, start with common calculations, or go straight to beam reactions, voltage drop or pump power.
Information management
ISO 19650 practice in plain English: roles, the CDE, states, naming and requirements.
ISO 19650 in plain English
Information management duties, not a modelling tutorial.
What a CDE is
The agreed system and process for sharing containers, and what it is not.
The four states
WIP, Shared, Published, Archive — and the mistake each one invites.
File naming that survives federation
Why the folder is not the name, and what to agree before the first upload.
Information requirements
OIR, AIR, PIR and EIR — who each one is for.
How the calculations are built
The worked logic behind the calculators, discipline by discipline.
Common calculations
Stress, section, unit and percentage tools in one table, with the stop for each.
Structural logic
Stress, section, deflection and Euler, with the worked figures.
Fluid logic
Velocity, Reynolds number, head and pump power as one chain.
Electrical logic
From resistance to kVAr, still short of BS 7671.
Weight and heat
Plate, rebar, expansion and UAΔT.
U-values and fabric heat loss
Layer sums, what they leave out, and watts.
Setting-out logic
Slope, stairs, curve and gears.
Where a preliminary figure stops
What each screen leaves out, and which standard or designer takes over.
Standards these tools do not replace
ISO 19650, Eurocodes, BS 7671, BS 5975, CIRIA, DMRB.
Mechanical calculations
Pump and shaft power, then the manufacturer curve.
Pipework velocity
A straight-pipe velocity and head loss.
Pad bearing pressure
Why average pressure is not a foundation design.
Electrical limits
What Ohm, voltage drop and three-phase power skip.
Temporary works
A hydrostatic bound is not a BS 5975 design.
Excavation quantities
In place, loose and compacted: trenches and cut and fill.
Infrastructure runoff
Where the rational method stops.
Editions of the standards named in these guides are listed on standards these tools do not replace.