ISO 19650 status code lookup
What a code means in each edition of the UK National Annex.
Why the edition matters
The same code can mean something different in each edition. S4 was stage approval in 2018 and is review and authorisation in 2021. S5 was withdrawn in 2018 and is back in 2021 for review and acceptance. S6 and S7 went the other way. Check which edition your project information standard adopts before relying on a code.
2021 revision
| Code | Meaning | Note |
|---|---|---|
| S0 | Developed within a task team | Work in progress |
| S1 | Suitable for coordination | Preliminary revision |
| S2 | Suitable for information or reference | Preliminary revision |
| S3 | Suitable for review and comment | Preliminary revision |
| S4 | Suitable for review and authorisation | Preliminary revision |
| S5 | Suitable for review and acceptance | Preliminary revision |
| S6 | Withdrawn in this revision | Not used |
| S7 | Withdrawn in this revision | Not used |
| An | Authorisation or acceptance, A1, A2 and so on | Contractual revision |
| Bn | Deprecated in this revision | Not used |
| CR | Withdrawn in this revision | Use A6 for as-constructed information |
2018 edition
| Code | Meaning | Note |
|---|---|---|
| S0 | Initial status | Preliminary revision and version |
| S1 | Suitable for coordination | Preliminary revision |
| S2 | Suitable for information | Preliminary revision |
| S3 | Suitable for review and comment | Preliminary revision |
| S4 | Suitable for stage approval | Preliminary revision |
| S5 | Withdrawn | Not used |
| S6 | Suitable for PIM authorization | Preliminary revision |
| S7 | Suitable for AIM authorization | Preliminary revision |
| An | Authorized and accepted, A1, A2 and so on | Contractual revision |
| Bn | Partial sign-off, B1, B2 and so on | Preliminary revision |
| CR | As constructed record | Contractual revision |
A status code shows what a container may be used for. It does not show that the content has been checked. For how the codes sit with the common data environment, read CDE states explained.
What changed in 2021
| Code | 2018 edition | 2021 revision |
|---|---|---|
| S0 | Initial status | Developed within a task team |
| S4 | Stage approval | Review and authorisation |
| S5 | Withdrawn | Review and acceptance |
| S6, S7 | PIM and AIM authorization | Withdrawn |
| A1 to An | Authorized and accepted | Authorisation or acceptance |
| B1 to Bn | Partial sign-off | Deprecated |
| CR | As constructed record | Withdrawn, use A6 for as-constructed information |
Reading a code on a real project
- A drawing at S2 can be used for information, but it hasn't been offered for coordination or comment.
- An S3 container invites comment. Comments go back to the author, and the revised version is shared again.
- S4 means different things by edition, so a team working to the 2018 annex and one working to 2021 could disagree about what it asks for.
- Moving a container from one code to another is a controlled step in the common data environment, not a rename.
Common mistakes
- Assuming a project follows the 2021 revision without checking its information standard.
- Using S6, S7 or CR on a project working to the 2021 revision.
- Treating a status code as proof that a technical check has taken place.
Questions
Can a project use its own codes?
Projects sometimes add codes, and the information standard should define them. This tool only knows the codes in the National Annex tables.
Why does A appear as An?
The number after A is set by the project, usually to match a stage or milestone, so A1, A2 and so on share one meaning.
Sources