Glossary
Project language, in this site’s words. Not definitions copied from a standard. Each term has its own link, such as /glossary#cde, so the guides can point straight to it.
| Term | In plain use |
|---|---|
| Appointing party | The organisation that says what information it needs and appoints others to produce it. Usually the client. |
| Lead appointed party | The organisation appointed directly by the appointing party that coordinates the information work of its delivery team. |
| Appointed party | An organisation appointed to produce information, often a subcontractor or consultant under a lead appointed party. |
| Delivery team | A lead appointed party and the appointed parties beneath it. |
| Task team | A group within a delivery team doing one piece of work, such as the structural design. |
| Information management function | Whoever runs the information process: the CDE, naming, checking. A function that one person or several may carry out. |
| OIR | Organisational information requirements. Why an organisation needs information about its assets at all. |
| AIR | Asset information requirements. What is needed to operate and maintain an asset. |
| PIR | Project information requirements. What the appointing party needs to make decisions during a project. |
| EIR | Exchange information requirements. What one appointment must deliver, in what form, by when. |
| PIM | Project information model. The information gathered during delivery. |
| AIM | Asset information model. The information kept for operating the asset. |
| BEP | BIM execution plan. The delivery team’s statement of how it will meet the requirements. |
| TIDP | Task information delivery plan. One task team’s list of containers and due dates. |
| MIDP | Master information delivery plan. The lead appointed party’s combination of the TIDPs. |
| Responsibility matrix | A table of who produces, checks and approves each piece of information. |
| Information protocol | Project-specific terms about information, such as licensing and use, attached to an appointment. |
| Information standard | The project rules: naming, status, classification and acceptance. |
| Level of information need | How much information is enough for a stated purpose. Replaces informal talk of BIM “levels”. |
| CDE | Common data environment. The agreed system and process for collecting, managing and sharing containers. |
| Information container | A named file or set of files managed as one unit: a model, drawing, schedule or report. |
| Work in progress (WIP) | The state where a task team develops information. Not visible to other teams. |
| Shared | The state for coordination. Others may use it, but only for the stated suitability. |
| Published | The state for information that has been authorised and accepted for a stated purpose, such as construction. |
| Archive | The state that keeps a record of superseded and completed information. |
| Suitability | Status metadata saying what a container may be used for. Distinct from revision and from state. |
| Revision | The version of a container. In the UK, preliminary and contractual revisions use different formats. |
| Federation | Combining discipline containers so clashes and gaps can be seen. Not a merge into one authoring file. |
| UK National Annex | The UK’s choices within ISO 19650-2, including naming fields and status codes. |
| Preliminary result | A figure from a stated formula. Not a design approval. |
| Utilisation | Action effect divided by design resistance. Needs a code; no calculator here gives one. |
| Direct stress | Axial force divided by the area that carries it. |
| Second moment of area (I) | A section property that sets bending stiffness about a stated axis. |
| Elastic section modulus (Z) | I divided by the distance to the extreme fibre. Moment over Z gives elastic bending stress. |
| Euler load | π²EI/L² for an ideal pinned strut. An upper bound, not a design resistance. |
| Darcy–Weisbach | Straight-pipe head loss from friction factor, length, diameter and velocity. Fittings are extra. |
| Friction factor | The dimensionless Darcy factor, f. It depends on Reynolds number and pipe roughness; you supply it here. |
| Reynolds number | ρvD/μ. Indicates laminar or turbulent flow; the band boundaries are conventions. |
| Hydraulic power | ρgQH. The power given to the fluid, before pump and motor efficiency. |
| Rational method | A peak-flow screen, Q = 2.78 C i A in the units used here. Not FEH. Q in L/s, i in mm/h, A in hectares. |
| Hydrostatic bound | Fluid pressure as unit weight times height. An upper picture, not a formwork design. |
| Power factor | Real power divided by apparent power. Below 1 means the supply carries more current than the real power needs. |
| Voltage drop | Voltage lost along a cable. Here a 20°C resistivity estimate, not a BS 7671 value. |
| 2R+G | Twice the rise plus the going of a step. A comfort check for stair geometry. |
| Temporary works coordinator | The BS 5975-1 procedure role. This site does not appoint one. |
Related: ISO 19650 in plain English · Standards · All guides
Last checked 14 October 2026. Original wording. Formal definitions stay in ISO 19650-1 and the other documents named.