Concrete volume calculator

A quantity take-off for a single element. Not a mix design, programme or pour sequence.

Worked examples

Example 1: Slab

4.5 m × 2.0 m × 200 mm = 1.800 m³ net. With a 5% allowance the order figure is 1.890 m³ (1,890 litres).

Example 2: Cylinder pile

A 600 mm diameter pile, 3.5 m deep: V = π × 0.6² × 3.5 / 4 = 0.990 m³ net, 1.039 m³ at 5%. Bored piles in poor ground often take more than the theoretical volume, so check the allowance with the piling contractor.

Reading the result

The net figure is the geometric volume. Ready-mixed concrete is usually ordered to a fraction of a cubic metre, and many suppliers have a minimum load, so round with the supplier rather than to the nearest litre.

Reinforcement displaces a small volume (typically 1–2% for ordinary slabs). It is normally ignored in ordering.

Common mistakes

  • Entering slab thickness in metres in the millimetre box: 0.2 entered as thickness gives a slab 1,000 times too thin.
  • Using the radius in the diameter box for a cylinder, which gives a quarter of the volume.
  • Leaving out thickenings, downstands and pile caps that are on the drawing but not in the main slab outline.
  • Treating the allowance as wastage you expect to see: it covers uncertainty in the formation and overbreak, not poor practice.

How to use

Choose the shape, then enter the dimensions. For a slab, enter length and width in metres and thickness in millimetres; for a cylinder, the diameter and height in metres. Add an order allowance in percent.

Edge cases

  • Negative dimensions are rejected, and the active shape needs dimensions greater than zero.
  • An order allowance of 0% gives the net volume. Typical allowances are 3–10% depending on the pour.

Questions

What volume is a 450 mm diameter pile 3 m long?

About 0.477 m³.

Why add an allowance?

Formwork deflects, the ground is never perfectly level, and some concrete is left in the pump and chute. An allowance of a few percent avoids running short at the end of a pour, which is worse than a small surplus.

Basis

This tool uses the formula shown under Method. It is standard arithmetic or physics and relies on no external data set or design standard, so check any values you enter against your own project data.

Last checked 14 October 2026. Worked figures are scenarios. See methodology and the disclaimer.