Common engineering calculations and their limits

These are the everyday relationships: stress, deflection, flow, power, weight, stairs. Each page keeps the formula visible. None of them is a code check.

CalculationOn this siteIt will not do
Ohm's law and resistorsOhm, series and parallelCable sizing
Voltage dropCopper estimateBS 7671
Three-phase power and power factorPower, kVArHarmonic study
Concrete volumeVolumeMix design
Beam moment and deflectionReactions, DeflectionSection check
Direct stress and modulusStress, EBuckling
Rectangle I and ZSectionSteel tables
Slope and stairsSlope, StairsApproved Document approval
Pipe velocity, Reynolds, headFlow, Reynolds, HeadNetwork design
Pump and shaft powerPump, ShaftMachine selection
Steel and rebar weightPlate, RebarA bar schedule
Thermal expansion and sensible heatExpansion, HeatRestrained stress, phase change
Earthworks and runoffVolume, RunoffMass haul, FEH
Percentage errorErrorAn uncertainty budget
Circle section, resultant, massCircle, Resultant, MassHollow sections, moisture
Heat loss, divider, single-phase powerHeat loss, Divider, Single phaseCompliance calc, loaded divider, cable size
Torque, gears, curve, EulerTorque, Gears, Curve, EulerEurocode buckling, transition curves

Why these sit together

The common set is the arithmetic that turns up beside almost every model: a stress, a section, a deflection, a unit change, a percentage gap. They are here so a federation review can check the order of a number without opening a design workbook.

Each page states the formula and one worked case. The worked case is the regression check. A 100 kN force on 2,000 mm² is 50 N/mm². A 100 mm circle is 7,854 mm². If the page disagrees with that, the page has changed and the method note is wrong.

Do not stack them into a utilisation. Stress, modulus and deflection answer different questions. The stop is written on each page.

Which calculator for which question

QuestionCalculatorWhere it stops
How much concrete do I order?Concrete volumeNet volume plus your allowance
How heavy is this plate or bar?Plate, rebarMass, not a lifting plan
What are the beam reactions?Beam reactionsStatics, not a section
What gradient is this?SlopeGeometry, not an approval
What power does this pump need?Pump powerDuty power, not a selection
How much voltage does this cable drop?Voltage dropA 20°C screen
Is this file name in the right pattern?File-name checkerOne pattern, not acceptance

Three habits that catch most errors

Units first. Most wrong answers come from a millimetre entered as a metre or a cm⁴ entered as a m⁴. Before you calculate, write the unit beside each input. Every calculator on this site states its units in the label.

A rough check by hand. Round the inputs and estimate the answer in your head. A 6 m beam with 8 kN/m carries about 48 kN in total, so each reaction is about 24 kN. If the tool says 240, an input is wrong.

Write the inputs beside the result. A number without its inputs cannot be reviewed. Every worked example on the site shows its inputs for this reason, and the methodology table lists them all.

Questions

Why are there no code checks?

A code check needs the right edition, the national annex, the project’s choices and a responsible engineer. A free page cannot supply those, so the site stops at the arithmetic and says so.

Which guide explains each group?

The discipline guides chain the calculators together: structural, fluids, electrical, setting out and weights and heat.

Rough checks against the tools

QuestionHand estimateTool result
Beam reactions, 8 kN/m on 6 m48 kN total, half each: 24 kN24 kN
Slab 4.5 × 2 × 0.2 m9 m² × 0.2 = 1.8 m³1.800 m³
Pump 0.02 m³/s at 15 m1,000 × 10 × 0.02 × 15 = 3 kW2.94 kW
16 A through 0.344 Ω16 × 0.35 ≈ 5.6 V5.5 V

Using g ≈ 10 instead of 9.81 keeps the pump estimate within 2%, which is enough to catch a factor-of-ten error.

What should I do if my hand estimate and the tool disagree?

Find out why before using either. Check the units of each input, then the formula the page states, then your estimate. A difference of a few percent is usually rounding or a constant like g; a factor of ten or a thousand is almost always a unit. If the tool is still different and you cannot see why, tell us through the contact page with the inputs, so we can check it.

Can I cite a result from this site?

Yes, with the page name, the inputs and the checked date shown on the page, and with the result described as a preliminary screen.

See also: our CAD tutorials.

Sources

Last checked 14 October 2026. Official design methods stay in the named standard. See standards these tools do not replace.