Home · Guides

Setting-out calculations: slope, stairs and curves

These are geometry. A passing figure is not compliance with a specification or an Approved Document. Two chained cases follow: an access route, then a drive.

An access route: ramp, stair and curve

Step 1: the ramp. A path rises 0.15 m over 3 m. Slope is rise over run: 5%, 1 in 20, 2.86°. Use slope. Whether 1 in 20 is acceptable, and over what length, is a question for Approved Document M and the project.

Step 2: the stair beside it. A separate stair climbs 2.7 m. With 15 risers of 180 mm and 14 goings of 250 mm, the pitch is about 35.8° and 2R+G is 610 mm. The flight runs 3.5 m on plan. Use stair rise and going. The 550 to 700 mm band is a comfort check; it is not an Approved Document K approval.

Step 3: the curve on the approach road. A circular curve of radius 200 m turns through 40°. Tangent length is R tan(Δ/2) = 72.79 m and arc length is RΔ in radians = 139.63 m. If the intersection point is at chainage 500.00 m, the curve starts at 427.21 m and ends at 566.84 m. No transition curve is included. Use horizontal curve.

A drive: gear, torque and power

Step 1: speed. A motor at 1,450 rpm drives a 20-tooth gear meshing with a 60-tooth gear. Output speed is 1,450 × 20/60 ≈ 483 rpm. Use gear ratio.

Step 2: torque. A 500 N force at 0.25 m radius on the output is 125 N·m. Use torque from force.

Step 3: power. 2πNT/60 at 483 rpm and 125 N·m is about 6.33 kW at the output shaft, before gear losses. Use shaft power.

The chain at a glance

StepResult
Ramp5%, 1 in 20
Stair35.8°, 2R+G 610 mm
CurveT 72.79 m, arc 139.63 m
Output speed483 rpm
Shaft power6.33 kW

Where the chain stops

Write the inputs beside every result. A review cannot check a tangent without the radius and the deflection, or a 2R+G figure without the rise and going. Coordinates, transitions, tolerances and approvals come from the survey, the specification and the regulations.

Changing the curve

A tighter road might use a 300 m radius turning through 30°. The tangent length is about 80.38 m and the arc about 157.08 m. With the intersection point at chainage 500.00 m, the curve runs from about 419.62 m to 576.70 m. Compare this with the 200 m and 40° curve above: the radius and the deflection both change the tangent length, so both must be stated on the drawing.

Reviewing setting-out figures

  • Is the run horizontal distance, not the length along the slope?
  • Do all steps in a flight have the same rise and going?
  • Is the deflection angle the angle between the two straights, not the angle at the intersection point?
  • Are chainages worked from the intersection point and checked against the drawing?
  • For the drive, are the tooth counts the driver and driven gears, the right way round?

Questions

Why does the stair need 15 risers but only 14 goings?

The top step is the landing or floor, so there is one fewer going than risers.

Why is a ramp in this guide?

Because a slope is geometry. The question of whether a ramp is acceptable belongs to the regulations and the access strategy, not to this guide.

What does a gear do to torque?

The 3:1 reduction cuts speed to a third and, ignoring losses, triples torque. Power stays the same apart from losses.

Setting out a stair flight

A floor-to-floor height of 2,600 mm divided into 14 risers gives about 185.7 mm per riser. With a 240 mm going, the pitch is about 37.7° and 2R + G is about 611 mm. Thirteen goings of 240 mm take 3,120 mm on plan, before the landings. If the plan length is limited, adding a riser lowers the rise but needs one more going, so the flight gets longer; the trade-off is easiest to see by working two or three options in a table.

RisersRise (mm)Going (mm)PitchPlan length
14185.724037.7°3,120 mm

How precise should setting-out figures be?

Report them to the precision the site can use. Chainages and tangent lengths are usually given to the nearest millimetre or centimetre, angles to seconds or decimal degrees as the survey requires, and stair rises to the nearest millimetre with the total checked against the floor-to-floor height. Rounding each step can make the last step different from the others, so set out from the total and distribute the rounding evenly.

Can I use the slope tool for a drainage fall?

Yes: a 1 in 80 fall over 24 m drops 0.3 m. The minimum fall and pipe size for self-cleansing come from the drainage design, not from the tool.

Related: Mechanical · Civil screens · Glossary

Sources

Last checked 14 October 2026. Approved Document K, 2013 edition; Approved Document M as listed in standards. The logic is the textbook relationship named above. It is not a code check. See standards these tools do not replace.