Home · Guides

The rational method for runoff, and when it applies

The rational method estimates a peak flow from a coefficient, a rainfall intensity and an area. In the units used here, Q in litres per second is 2.78 × C × i (mm/h) × A (hectares). One millimetre per hour on one hectare is 2.78 litres per second, which is why the factor appears.

Worked catchment

C 0.8, 50 mm/h, 0.4 ha gives 44.5 L/s. That is a screening figure for a small paved area. It is not a flood estimate. It assumes the whole area contributes at once, and that intensity lasted at least as long as the time of concentration. Neither was checked.

Where practice goes next

Highway drainage in the UK is tied to the Design Manual for Roads and Bridges. Sewer adoption looks to the water company’s standard, often Sewers for Adoption or its successor. Flood estimation for larger catchments uses FEH, not this equation. SuDS storage is a volume problem, not a peak from the rational method alone.

Scope: this guide explains how to use the rational method sensibly. For the calculator itself, see rational runoff.

An area-weighted coefficient

Real sites mix surfaces. Weight each runoff coefficient by its area and divide by the total. The table shows a 0.4 ha site with roofs, paving and grass. The coefficients are typical values for illustration; use the values the drainage authority accepts.

SurfaceArea (ha)CC × A
Roofs0.150.950.1425
Paving0.100.900.0900
Grass0.150.200.0300
Total0.400.6560.2625

The weighted coefficient is 0.2625 / 0.40 ≈ 0.656. At 50 mm/h the peak is 2.78 × 0.656 × 50 × 0.4 ≈ 36.5 L/s, against 44.5 L/s if the whole site were treated as paved at C = 0.8. Using one coefficient for a mixed site is one of the commonest ways a screen goes wrong in either direction.

Choosing the intensity

The method assumes the storm lasts at least as long as the time of concentration, the time for water from the furthest part of the catchment to reach the point being checked. A typical estimate adds an entry time for overland flow to the time to travel along the pipes. With a four-minute entry time and 120 m of pipe at about 1 m/s, the time of concentration is about six minutes. The design intensity is then read for that duration and the chosen return period from the rainfall data the project uses. A shorter time of concentration means a higher intensity, which is why small paved sites produce high peaks.

Where the rational method fits

  • Small, mostly impermeable catchments where a peak flow is the question, such as sizing a short sewer or checking a gully run.
  • Early screening to see whether a proposed connection is likely to be acceptable before a full model is built.
  • Not for storage volumes, not for large or rural catchments and not for flood estimation. Those need methods based on hydrographs and, in the UK, FEH.

Questions

Why does the factor 2.78 appear?

One millimetre of rain per hour on one hectare is 10 m³ per hour, which is 2.78 litres per second. The factor converts the units used here; it is not a safety factor.

Does climate change affect the figure?

Drainage design in the UK normally applies an allowance to rainfall intensity for climate change. The allowance depends on the guidance the project follows; apply it to i before you use the calculator.

Reviewing a submitted runoff calculation

  • Are the areas measured from the drawing and do they add up to the site area?
  • Are the coefficients justified for each surface, and is the weighting shown?
  • Is the intensity for the stated return period and a duration equal to the time of concentration?
  • Has the climate change allowance been applied, and from which guidance?
  • Is the result being used for a peak, not for a storage volume?

Does permeable paving have a low C?

It can, but only while it is working as designed. Its contribution depends on the sub-base, the ground beneath and maintenance. Treat it as the drainage design specifies rather than choosing a low coefficient to make the numbers work.

Can I use the result to size a pipe?

As a first estimate for a short run on a small catchment, yes. Divide the peak flow by an assumed velocity to get an area, and choose a pipe with a little spare capacity. A drainage design then checks full and part-full capacity, minimum self-cleansing velocities and the downstream connection.

What return period should I use?

The one the drainage authority or the project brief requires for the check in hand. Different checks, such as pipe-full capacity, surcharge and flooding, often use different return periods, so state the return period beside every intensity.

Open the rational runoff calculator.

Sources

Last checked 14 October 2026. Original guidance. Standards text stays with the publisher.